US regulators propose heat-season grid reliability rules
Utilities must pre-position backup power as summer peaks collide with data-centre demand.
Federal energy regulators drafted rules requiring utilities in high-temperature zones to pre-position mobile generation and publish hourly reserve margins during heat waves. The move follows outages linked to surging air-conditioning and data-centre loads.
Consumer advocates asked for targeted bill relief when utilities invoke emergency tariffs. Technology firms offered demand-response partnerships to shave afternoon peaks.
Grid operators in Texas and California said coordination with renewable curtailment protocols remains unresolved. WOP360 will track public comment outcomes due next month.
Commentaires
Aucun commentaire publié pour le moment. Soyez le premier à réagir après modération.
Laisser un commentaire
Les commentaires sont modérés avant publication (charte éditoriale).